Before and after Digital X-Ray Unit Installation – Togo
The sterile process is based on Steam Temperature and Pressure for a precise period of time to kill the BUGS. On the mission field there are two types of sterilizers. Those which are manually controlled by an operator and those that a computer controls the operation and timing of the process.
My first assignment was replacing a defective power supply circuit board in the OUTBACK POWER systems inverter. It had failed some months back and we were able to get a warranty replacement, but I had to do the replacement on site.
Tenwek Hospital is a large hospital of greater than 300 beds and 7 surgical suites. It is situated about 8 KM from the city of Bomet. Many of the outpatients must take public transport to the hospital to be seen by healthcare professionals. The hospital has purchased and is opening a clinic in the town limits of Bomet to be more convenient for patients. We will be installing a state of the art Digital radiology suite in the clinic which will interface with the main Tenwek Hospital radiology department.
Tenwek Hospital is a large hospital of greater than 300 beds and 7 surgical suites. It is situated about 8 KM from the city of Bomet. Many of the outpatients must take public transport to the hospital to be seen by healthcare professionals. The hospital has purchased and is opening a clinic in the town limits of Bomet to be more convenient for patients. We will be installing a state of the art Digital radiology suite in the clinic which will interface with the main Tenwek Hospital radiology department.
The above pictures are taken from my workshop area in the basement of my house in Boone, NC. I am configuring, fabricating additions to the cabinets, bus bars, battery wiring and circuit breakers for the project at the International Vision Volunteers Clinic in Zimba, Zambia. This prefabrication will save many days of field work. We are awaiting the battery inverters from SMA Germany to complete the shipment being handled by JAARS in Waxhaw, NC.
ABWE Karolyn Kemptom Hospital in Tsiko Togo has contacted me to purchase and install a new Digital X-ray Suite. It will be similar to the unit that I installed in Kenya for Tenwek Hospital in Bomet.
World Wide Engineering has asked me to be the electrical consulting engineer on a hydro electrical plant design, purchase and installation of a 400 KW Pelton wheel hydro plant. I have spent many hours and three trips to Germany developing, reviewing drawings, and coordinating the electrical controls for this installation at Mbingo Hospital.
We will start with 50 KW in two ground mounted solar arrays. This will reduce their overall power bill by 30%. If this works out well for them, they will increase the capacity to 150 KW total which should eliminate their electrical power bill.