Noah, Ryan and I installed 20 medical gas O2 outlets including all the piping spanning through three buildings and connecting walk ways. The complete system included an On Site Gas O2 Concentrator and Rix high pressure pump for filling H cylinders.
Scheduled
2018
Location
ELWA Hospital, Liberia
Project Scope
To install a large O2 concentrator system including an H cylinder filling station along with piping for O2 outlets in the maternity, ICU, and ER areas
Time: 1 week
Skills: Commercial Electrician with Solar and Inverter experience