We will start with 50 KW in two ground mounted solar arrays. This will reduce their overall power bill by 30%. If this works out well for them, they will increase the capacity to 150 KW total which should eliminate their electrical power bill.
A project is really never really finished. We will be travelling to Galmi Hospital to complete the additional piping requested to the piped Medical Gas System we installed this past few months. In addition, we will be recommissioning an OUTBACK Power systems Battery Backup system.
Galmi is a healthcare facility in a remote section of Niger. O2 is needed of the surgical and critical care patient treatment areas. Since the hospital is located in a remote section of Niger, transporting O2 in H Cylinders is a costly and dangerous adventure. We will be installing an O2 concentrator system which will provide much needed O2 to the patient care areas and filling H cylinders for backup and transporting patients.