My first assignment was replacing a defective power supply circuit board in the OUTBACK POWER systems inverter. It had failed some months back and we were able to get a warranty replacement, but I had to do the replacement on site.
As you can easily see from the picture, the electrical distribution system that connects the incoming utility power, the diesel generator set and the output electrical distribution system at the hospital needs significant upgrades.
The Cure International Hospital in Dominican Republic was forced to close its doors this past year. I travelled ter to remove the X-Ray equipment I installed just two years prior. The equipment was shipped to the Cure International Hsoptial in Uganda. I will be travelling there to reinstall the equipment.