The last piece of the OFF GRID solar power project at Zimba Hospital was to rewire the power distribution panel to include the Maternity, Neonatal, and administration buildings. We tugged and pulled in a new electrical cable and then proceeded to clean up and rewire five new circuits within the existing power distribution panel and adding them to the newly installed panel. This turned into a much bigger project as we had to deal with several “MYSTERIOUS” circuits.